FGCU Alico Arena – Phase II

A complete renovation was done to the existing Strength and Conditioning Facility to elevate FGCU to the standards of other Division I programs. The interior load-bearing walls were removed to increase the usable space to enhance the room with an open floor plan. New LED lighting was installed for energy efficiency and improved lighting quality. A new heavy-duty sports floor was installed, complete with FGCU logos, capable of withstanding the impact from heavy free-weights. An artificial turf “sprint track” was installed as well.
All coaches and staff offices were completely renovated with all new floor finishes, new LED lighting fixtures, and surfaces re-painted.